Rack - Work in progress

3 years ago we moved up our move-in timeline and it gave me 3 days to move and setup our gear, endpoints, APs etc etc.

We originally had BVE, so I dedicated the left side of the rack to all our VoIP stuff, right side was network, cameras and door access control. Now that we are using UniFi Talk, that isn’t needed, but the cabling is too short to move it to the other side. So, I moved some of the UI gear over and started the process of wire management.

Work in progress for sure, but it looks way better than the spaghetti monster that I have looked at for the last 3 years.

This was my first “big” rack and there are so many things I’d do differently next time.