PSA: Earthquake is Shut Down Until March 2025

According to my insider source, an accident occurred where a guest was struck by some element or part that came lose.

As of today, they're doing test runs with Tram 8310 loaded with sand bags, and there is also a hydraulic service subcontractor doing work inside Stage 50 as well.

Still is the best part of the tour though, nothing will ever change my mind.